i) Type of building –whether a domestic, commercial.
ii) Foundation condition.
iii) Spans to be covered
iv) Nature and magnitude of the loads that may be imposed on it, including the suspension of machinery.
v) Possibility of future alteration.
vi) Speed of construction or erection.
vii) Economy and aesthetic consideration.
steve williams answered the question on January 1, 2018 at 15:50
- Give five functional requirements of foundations(Solved)
Give five functional requirements of foundations.
Date posted: January 1, 2018. Answers (1)
- Explain how to test for silt content in sand.(Solved)
Explain how to test for silt content in sand.
Date posted: January 1, 2018. Answers (1)
- List five causes of unsealing of traps(Solved)
List five causes of unsealing of traps.
Date posted: January 1, 2018. Answers (1)
- State 5 principles of a good drainage system.(Solved)
State 5 principles of a good drainage system.
Date posted: January 1, 2018. Answers (1)
- What is critical Mach number in high speed flight?(Solved)
What is critical Mach number in high speed flight?
Date posted: December 29, 2017. Answers (1)
- Give reasons as to why a star delta starter is preferred with induction motor(Solved)
Give reasons as to why a star delta starter is preferred with induction motor
Date posted: November 6, 2017. Answers (1)
- State four advantages of using aluminum tubes over steel when making scaffolds.(Solved)
State four advantages of using aluminum tubes over steel when making scaffolds.
Date posted: October 11, 2017. Answers (1)
- Explain briefly two reasons why blinding is necessary.(Solved)
Explain briefly two reasons why blinding is necessary.
Date posted: October 11, 2017. Answers (1)
- Give four methods of transporting wet concrete to the required position.(Solved)
Give four methods of transporting wet concrete to the required position.
Date posted: October 11, 2017. Answers (1)
- List four factors that influence the cost of building work.(Solved)
List four factors that influence the cost of building work.
Date posted: October 11, 2017. Answers (1)
- Explain four factors that may improve reputation of a contractor.(Solved)
Explain four factors that may improve reputation of a contractor.
Date posted: October 11, 2017. Answers (1)
- Give two reasons for providing hoarding on a construction site.(Solved)
Give two reasons for providing hoarding on a construction site.
Date posted: October 11, 2017. Answers (1)
- List four factors to consider when selecting type of a roof structure.(Solved)
List four factors to consider when selecting type of a roof structure.
Date posted: October 11, 2017. Answers (1)
- State three possible causes of ground movement under foundation.(Solved)
State three possible causes of ground movement under foundation.
Date posted: October 11, 2017. Answers (1)
- List three welfare services for the operatives on a building site.(Solved)
List three welfare services for the operatives on a building site.
Date posted: October 11, 2017. Answers (1)
- Differentiate between the term cascade and cascode as used in amplifiers (Solved)
Differentiate between the term cascade and cascode as used in amplifiers
Date posted: September 18, 2017. Answers (1)
- What is troubleshooting in engineering firm?(Solved)
What is troubleshooting in engineering firm?
Date posted: September 17, 2017. Answers (1)