•The budget: A well-designed system incurs greater expenses. The total system cost of meeting the objectives must be considered in the light of the available budget.
•Time: Time taken to produce a very usable system would increase development cost and delay system delivery.
•Integration with other existing system: Existing and planned system may limit option and available features of the system.
•Skills: Limitation may arise from the range of skills and level of competence in both the design team and the system users.
•Standards: Standards may drive the design tasks in a specified direction.
Steve ju answered the question on October 13, 2018 at 18:02
- Describe the criteria used in designing a system(Solved)
Describe the criteria used in designing a system
Date posted: October 13, 2018. Answers (1)
- Give the limitations of system design (Solved)
Give the limitations of system design
Date posted: October 13, 2018. Answers (1)
- Outline the importance of system analysis(Solved)
Outline the importance of system analysis
Date posted: October 13, 2018. Answers (1)
- Describe the contents of statement of requirements(Solved)
Describe the contents of statement of requirements
Date posted: October 13, 2018. Answers (1)
- Give the objectives or aims of system analysis (Solved)
Give the objectives or aims of system analysis
Date posted: October 13, 2018. Answers (1)
- Describe the components of computer aided software engineering tools(Solved)
Describe the components of computer aided software engineering tools
Date posted: October 13, 2018. Answers (1)
- Give reasons why computer ethics are necessary(Solved)
Give reasons why computer ethics are necessary
Date posted: October 11, 2018. Answers (1)
- Suggest ways that can be used to overcome resistance of a new system(Solved)
Suggest ways that can be used to overcome resistance of a new system
Date posted: October 11, 2018. Answers (1)
- Describe problems that may be encountered when implementing a computer based system(Solved)
Describe problems that may be encountered when implementing a computer based system
Date posted: October 11, 2018. Answers (1)
- What factors makes organisation change from one system to another?(Solved)
What factors makes organisation change from one system to another?
Date posted: October 11, 2018. Answers (1)
- Outline the antagonistic behavior that may indicate resistance to adopt the new system by the user(Solved)
Outline the antagonistic behavior that may indicate resistance to adopt the new system by the user
Date posted: October 11, 2018. Answers (1)
- Outline the causes of resistance by the user to adopt a new system(Solved)
Outline the causes of resistance by the user to adopt a new system
Date posted: October 11, 2018. Answers (1)
- Give the advantages of computer aided software engineering tools(Solved)
Give the advantages of computer aided software engineering tools
Date posted: October 11, 2018. Answers (1)
- Discuss the objectives of computer aided software engineering tools(Solved)
Discuss the objectives of computer aided software engineering tools
Date posted: October 11, 2018. Answers (1)
- Describe the project change procedure(Solved)
Describe the project change procedure
Date posted: October 11, 2018. Answers (1)
- Describe ways of managing a risk(Solved)
Describe ways of managing a risk
Date posted: October 11, 2018. Answers (1)
- Describe the risk management process(Solved)
Describe the risk management process
Date posted: October 11, 2018. Answers (1)
- Give the benefits of network analysis(Solved)
Give the benefits of network analysis
Date posted: October 11, 2018. Answers (1)
- Outline rules for drawing a network diagram(Solved)
Outline rules for drawing a network diagram
Date posted: October 11, 2018. Answers (1)
- Explain the characteristics of a project manager(Solved)
Explain the characteristics of a project manager
Date posted: October 11, 2018. Answers (1)