- Water demand
The determination of water demand consists of four parts: (1) selection of a design
period, (2) estimation of the population, commercial, and industrial growth, (3)
estimation of the unit water use, and (4) estimation of the variability of the demand.
- Water source evaluation
What is your source? (Surface or underground), what are available quantities, is the
source reliable?
- Water quality
Physical characteristics (color, turbidity, temperature, and, in particular, taste and
odor.), Chemical characteristics (prescence of heavy metals, fluoride e.t.c.),
microbiological characteristics and radiological characteristics (Presence of
radioactive materials).
- Evaluation of process options
Begin screening alternative supply and treatment options.
- Plant sizing and layout
Once the preliminary selection of the water treatment unit operations and processes
has been made rough calculations are made to determine sizes to be used in
examining feasibility of site locations and cost. The elements to be considered in plant
sizing include: (1) number and size of process units, and (2) number and size of
ancillary structures. The layout should include: (1) provision for expansion, (2)
connection to the transportation net, (3) connection to the water distribution system,
and (4) residuals handling system.
- Plant location
Ideally a site comparison study will be performed after alternatives have been
screened and rough sizing of the processes is complete. Many factors may preclude
the ideal situation. For example, in highly urbanized areas the availability of land may
preclude all but one site. In some cases the availability of land may force the selection
of processes that fit into the available space.
- Project evaluation
When the alternatives the planners task is to provide data which aid the choice
among alternatives. The choice among alternatives is governed by the economic
and financial feasibility and their social acceptability with respect to possible
environmental impact.
- Financial considerations in planning:
In order to implement a project proposal finding the money to build and operate it
is essential. Input from financial specialist is essential in order to develop a good
plan for financing. This is a prime requisite for the successful implementation of
a project.
- Environmental consideration in planning:
Where a project is seen to be essential, it is necessarily careful to consider the
ecological impact on the stream and adjacent areas and develop a plan that will
have minimum detrimental effects to the scheme and adjacent areas other
measures to be considered include Special treatment of surface to avoid large
expenses of circuit coiling the surrounding and planting of grass, shrubs or trees to
enhance visual feeling.
NatalieR answered the question on June 30, 2022 at 07:33
- Outline factors considered when siting terraces on a sloping land(Solved)
Outline factors considered when siting terraces on a sloping land
Date posted: June 30, 2022. Answers (1)
- List any five areas protected by the agriculture act cap 318 of the laws of Kenya(Solved)
List any five areas protected by the agriculture act cap 318 of the laws of Kenya
Date posted: June 30, 2022. Answers (1)
- With the aid of a sketch explain the operation of a hydram pump(Solved)
With the aid of a sketch explain the operation of a hydram pump
Date posted: June 30, 2022. Answers (1)
- Outline any factors considered when selecting a drainage method(Solved)
Outline any factors considered when selecting a drainage method
Date posted: June 30, 2022. Answers (1)
- State any five causes of water logging in farms(Solved)
State any five causes of water logging in farms
Date posted: June 30, 2022. Answers (1)
- Determine the discharge capacity of an underground concrete pipeline given that;
Diameter of pipeline – 15 cm
Length of pipeline – 300m
Darcy’s roughness coefficient – 0.009
Difference in...(Solved)
Determine the discharge capacity of an underground concrete pipeline given that;
Diameter of pipeline – 15 cm
Length of pipeline – 300m
Darcy’s roughness coefficient – 0.009
Difference in elevation between water levels at pump-stand and discharge point – 2m
Date posted: June 30, 2022. Answers (1)
- Explain the following irrigation requirements
i) Net irrigation requirement
ii) Gross irrigation requirement
iii) Consumption use
iv) Irrigation interval
(Solved)
Explain the following irrigation requirements
i) Net irrigation requirement
ii) Gross irrigation requirement
iii) Consumption use
iv) Irrigation interval
Date posted: June 30, 2022. Answers (1)
- Explain human activities that contribute to water pollution(Solved)
Explain human activities that contribute to water pollution
Date posted: June 30, 2022. Answers (1)
- Explain any five factors considered when selecting a water supply source(Solved)
Explain any five factors considered when selecting a water supply source
Date posted: June 30, 2022. Answers (1)
- Determine;
i) The moisture content at different depths in the root zone
ii) Moisture content in the root zone at the time of irrigation
iii) Net depth of...(Solved)
The following data was collected to determine the soil moisture content at successive
depths in the root zone before irrigation;
Given that the bulk density of the soil in the root zone is 1.60g/cc and the available moisture
holding capacity of the soil was 16.9cm/m depth, determine;
i) The moisture content at different depths in the root zone
ii) Moisture content in the root zone at the time of irrigation
iii) Net depth of water to be applied to bring the moisture content to field capacity
iv) Gross irrigation requirement at an estimated irrigation efficiency of 80%
Date posted: June 29, 2022. Answers (1)
- Define the following terms
i. Saturation Capacity
ii. Ultimate wilting point(Solved)
Define the following terms
i. Saturation Capacity
ii. Ultimate wilting point
Date posted: June 29, 2022. Answers (1)
- Define permanent wilting point(Solved)
Define permanent wilting point
Date posted: June 29, 2022. Answers (1)
- Find the drainage coefficient of the land(Solved)
A drainage canal discharges 0.2m3 of water per second and drains 250 hectares
Find the drainage coefficient of this land
Date posted: June 29, 2022. Answers (1)
- What is drainage coefficient?(Solved)
What is drainage coefficient?
Date posted: June 29, 2022. Answers (1)
- Discuss the functions of water as used in irrigation(Solved)
Discuss the functions of water as used in irrigation
Date posted: June 29, 2022. Answers (1)
- Outline four user related provisions contained in Riparian rights, permit system and appropriative rights
(Solved)
Outline four user related provisions contained in Riparian rights, permit system and appropriative rights
Date posted: June 29, 2022. Answers (1)
- Outline the problems associated with increase of sodium salts in soil(Solved)
Outline the problems associated with increase of sodium salts in soil
Date posted: June 29, 2022. Answers (1)
- Define the term runoff coefficient(Solved)
Define the term runoff coefficient
Date posted: June 29, 2022. Answers (1)
- Describe the methods of drilling wells(Solved)
Describe the methods of drilling wells
Date posted: June 29, 2022. Answers (1)
- Highlight characteristics of contaminated water(Solved)
Highlight characteristics of contaminated water
Date posted: June 29, 2022. Answers (1)